综采工作面过顶板破碎段围岩支护技术研究

Surrounding rock support technology in crushing section of passing through roof of fully mechanized mining face

  • 摘要: 【目的】为提高综采工作面回采过特殊地质构造区域时围岩的稳定性,以矿井3111工作面为研究对象,针对工作面过空巷期间围岩破碎、稳定性较差,且采用传统锚网索支护工艺支护效果不佳的难题,【方法】提出工字钢组合架棚支护工艺,并对3111工作面空巷围岩变形特征及工字钢组合架棚承载能力适用性展开分析。【结果】采用数值模拟分析手段对不同架棚间距下巷道围岩位移变形程度进行对比分析,确定了工字钢最优支护棚距为800 mm,明确了3111工作面过空巷段与过特殊区域构造段支护工艺,【结论】实践表明,该支护工艺围岩稳定性控制效果显著。在工作面回采过空巷期间,巷道两帮最大移近量为165 mm,顶底板最大移近量为242 mm,巷道未出现严重的顶板破碎、下沉、底板鼓起、煤壁大面积片帮等现象,围岩变形程度均在可控范围内,工作面安全回采得到了有效保障。

     

    Abstract: In order to improve the stability of the surrounding rock when the fully mechanized mining face is mined through the special geological structure area, taking the 3111 working face of the mine as the research object, aiming at the problem of poor fragmentation and stability of the surrounding rock during the abandoned roadway of the working face, and the poor support effect of the traditional anchor net cable support process, the I-beam composite scaffolding support process is proposed, and the deformation characteristics of the surrounding rock of the 3111 working face and the applicability of the bearing capacity of the I-beam composite scaffolding are analyzed.Numerical simulation analysis method is used to compare and analyze the displacement and deformation degree of the surrounding rock of the roadway under different scaffolding spacing, and the optimal support shed distance of the I-beam is determined to be 800 mm, and the support process of the 3111 working face through the abandoned roadway section and the structural section of the special area is clarified, and the practice shows that the stability control effect of the surrounding rock of the support process is significant, and the maximum convergence of the two sides of the roadway is 165 mm, and the maximum convergence of the roof and floor is 242 mm, and the roadway does not have serious roof breakage, subsidence, and floor heave.The deformation degree of the surrounding rock is within a controllable range, and the safe mining of the working face has been effectively guaranteed.

     

/

返回文章
返回