离柳矿区朱家店煤矿沿空留巷围岩控制技术研究

Surrounding rock control of gob-side entry retaining in Zhujiadian Coal Mine of Liliu mining area

  • 摘要: 【目的】以朱家店煤矿沿空留巷为研究对象,通过理论分析及现场试验相结合的手段,深入分析了该矿沿空留巷围岩变形机理,结合地质与开采条件,提出了针对性的围岩控制技术,包括切顶卸压、恒阻大变形锚索、巷旁充填、煤壁加固、混凝土支柱辅助支护等技术手段。【方法】通过现场监测以及工程实践,验证了所采用技术的有效性。【结果及结论】现场监测结果表明,工作面顶底板移近量相比原支护方案降幅达到36%,两帮收敛量降幅达到52%;补强的锚索轴力稳定在193.5 kN,锚索的承载空间较大,充填体结合混凝土支柱明显提高了承载能力。所提出的控制技术可为类似煤矿沿空留巷工程提供参考与借鉴。

     

    Abstract: Taking the gob-side entry retaining in Zhujiadian Coal Mine as the research object, this paper analyzes the deformation mechanism of the surrounding rock of the gob-side entry retaining in the mine by combining theoretical analysis and field tests.In combination with the geological and mining conditions, targeted surrounding rock control technologies are proposed, including roof cutting and pressure relief, constant resistance and large deformation anchor cables, roadside filling, coal wall reinforcement, concrete pillar auxiliary support and other technical means.Through on-site monitoring and engineering practice, the effectiveness of the adopted technologies has been verified.The on-site monitoring results show that compared with the original support scheme, the displacement amount of the roof and floor of the working face has decreased by 36%,and the convergence amount of the two sides has decreased by 52%.The axial force of the reinforced anchor cable is stably maintained at 193.5 kN,and the anchor cable has a large bearing space.The filling body combined with the concrete support has significantly improved the bearing capacity.

     

/

返回文章
返回