软岩地质条件下相邻工作面留设煤柱距离研究

Distance between retained coal pillars in adjacent working faces under soft rock geological conditions

  • 摘要: 【目的】从内蒙古鄂尔多斯某软岩地质条件煤矿的5号煤层工作面准备巷道的围岩稳定性出发,着重探讨在上覆4号煤层采空区时,下部5号煤层工作面准备巷道与相邻工作面顺槽煤柱的留设距离问题。【方法】通过在FLAC3D软件中建立的数值模拟的塑性区与垂直应力结果表明,【结果及结论】5号煤层工作面准备巷道应尽量避免布置在上覆4号煤层留设煤柱的应力集中范围与5号煤层工作面开采影响的侧向支承压力范围内。同时,留设煤柱距离越大,巷道围岩稳定性也越强,但是考虑到巷道综合掘进成本与煤矿的实际地质条件,最后选择40 m作为下部5号煤层工作面准备巷道与上工作面顺槽留设煤柱的最佳距离。

     

    Abstract: Starting from the surrounding rock stability of the 5# coal seam working face preparation roadway in a coal mine with soft rock geological conditions, we focus on the retention distances of coal pillars between the lower 5# coal seam working face preparation roadway and the neighboring working face gate entry in overlying 4# coal seam goaf area.The plastic zone and vertical stress results of the numerical model established in FLAC3D show that the preparation roadway for the 5# coal seam working face should be avoided as much as possible to be arranged within the stress concentration range of the retained coal pillar for the overlying 4# coal seam and the lateral abutment pressure range of the 5# coal working face mining influence.At the same time, the larger the width of the coal pillar, the stronger the stability of the roadway surrounding rock, but considering the comprehensive tunneling cost and the actual geological conditions of the mine, 40 m is finally chosen as the optimal distance between the preparation roadway for the working face of the lower 5# coal seam and the retained coal pillar of the upper working face entry.

     

/

返回文章
返回