复杂地层条件下西部地区煤矿斜井建设技术研究进展

Research progress in inclined shaft construction technology for coal mines in western region under complex geological conditions

  • 摘要: 【目的及方法】井工开采深部矿产资源必须建井先行。对于穿过松散富水表土或富水软弱岩层等复杂地层条件下的斜井,普通法施工无法通过,必须采用降水法、注浆法、冻结法等特殊工法进行施工。故论述降水法、注浆法、冻结法、盾构法(TBM)等工法的适用性,并对国内采用斜井开拓的煤矿和复杂地层斜井建设工程进行简要介绍,重点对复杂地层斜井建设技术从冻结段井壁结构、冻结工艺、掘砌技术等方面进行详细介绍。【结果及结论】对我国西部地区斜井建设的经验与教训作了总结,列举了部分建井期间被迫改用冻结法抢险或修复井筒的煤矿案例,进一步明确了在西部地区白垩系、侏罗系孔隙含水为主的弱胶结砂岩层条件下,基岩冻结法凿井更具适应性,为我国同类地质条件矿井的斜井施工方案提供了借鉴。

     

    Abstract: Drillers must build shafts before exploiting deep mineral resources. For inclined shafts passing through complex geological conditions such as loose rich water soil or rich water weak rock layers,ordinary construction methods cannot achieve smooth excavation and masonry. Therefore,special construction methods such as precipitation method,grouting method,and freezing method must be used for construction. The article discusses the applicability of construction methods such as precipitation method,grouting method,freezing method,and shield tunneling method (TBM). It briefly introduces the construction projects of coal mines and complex strata inclined shafts using inclined shaft development in China,focusing on the construction technology of complex strata inclined shafts from the aspects of frozen section wellbore structure, freezing process,and masonry technology. The author summarizes the experience and lessons from the construction of inclined shafts in western China,and lists some coal mine cases where the freezing method was forced to be used for emergency rescue or repair of shafts during the construction period. It further clarifies that under the weakly cemented sandstone layer conditions dominated by pore water content in the Cretaceous and Jurassic periods in western China,the bedrock freezing method is more suitable for drilling wells.

     

/

返回文章
返回