岳城煤矿2303(上)工作面高水材料沿空留巷切顶卸压参数研究

Roof-cutting pressure relief parameters of high-water materials gob-side entry retaining of 2303(upper) working face in Yuecheng Coal Mine

  • 摘要: 针对岳城煤矿采用沿空留巷存在着巷道维护困难的问题,以2203(上)工作面为研究对象,采用关键层理论、FLAC3D模拟以及围岩变形实测等方法,对2203(上)工作面切顶卸压技术参数进行研究。结果表明,通过经验参数结合关键层判别程序得出顶板上方44.27 m粉砂岩为主关键层,16.18 m细粒砂岩为亚关键层;切顶方向为工作面方向,切顶高度为10 m,切顶角度为70°,炮孔间距为2 m;根据现场实测表明,采用切顶卸压后,巷道围岩变形较小,巷旁充填体完整性较好。研究结果为相似矿井沿空留巷提供了依据。

     

    Abstract: Addressing the challenge of difficult roadway maintenance in the gob-side entry retaining system employed at Yuecheng Coal Mine, this paper focuses on the 2203(upper) working face.Utilizing key stratum theory, FLAC3D simulation, and actual measurements of surrounding rock deformation, the author investigates the technical parameters of roof-cutting and pressure relief for the 2203(upper) working face.The results indicate that through empirical parameters combined with the key layer identification program, the main key layer is identified as the siltstone above the roof, which is 44.27 meters thick, and the sub-key layer is identified as the fine-grained sandstone, which is 16.18 meters thick.The roof-cutting direction is aligned with the working face, the roof-cutting height is 10 meters, the roof-cutting angle is 70°,and the blasting hole spacing is 2 meters.Field measurements show that after employing the roof-cutting pressure relief technique, the deformation of the surrounding rock in the roadway is minimal, and the integrity of the filling body beside the roadway is better preserved.

     

/

返回文章
返回